Great Lakes Naval Training Center, Building 11 – Removal of Thermal System Insulation from Great Lakes Naval Training Center’s main boiler house de-aerator area. The project was completed successfully and on time without incident.  Boiler room remained fully operational during removal at which time AES, Inc. took great care to protecting chief engineer’s offices directly below containment.